HOME
|
News
|
Case Studies
|
Careers
11 February 2008
Repair work to lock gates at Brentford Marina
Brentford Marina have awarded TEMA Engineering a contract to carry out repair works on their existing lock gates.
The work will have to be carried out at low tide.