Total Engineering Solitions About UsMarineHighwaysRailwaysEngineeringCorrosion ProtectionPartners and LinksContact Us
 
 
 
18 June 2007
Refurbished bridge now reinstalled


TEMA Engineering have reinstalled the footbridge at Patchway Station in Bristol.

TEMA Engineering were contracted to remove, refurbish and reinstall the existing footbridge - a project carried out using TEMA Engineering in house facilities.
 
 
 
 

back to news