| |
| |
18 June 2007
Refurbished bridge now reinstalled
TEMA Engineering have reinstalled the footbridge at Patchway Station in Bristol.
TEMA Engineering were contracted to remove, refurbish and reinstall the existing footbridge - a project carried out using TEMA Engineering in house facilities.
|
|
|
| |
| |
|
| |
|
|
|