| |
| |
19 January 2007
Exeter Cable Stay Bridge completed
TEMA Engineering have successfully completed the supply and installation of the Cable Stay Bridge for Exeter Chiefs new Rugby Stadium.
The Bridge was installed during several night time road closures as to minimise disruption to the public.
|
|
|
| |
| |
|
| |
|
|
|