Uphill – Flood Defence Gates.
Date: 01/07/2004
Company: TEMA Engineering
|
| |
|
|
|
TEMA Engineering completed the supply and installation of the Flood Gate in July 2004.
The project will protect the local area from flood by control of river flow via a sluice gate.
The structure was designed by KGA Ltd. of Bournemouth.
TEMA Engineering carried out the complete supply, manufacture, painting and installation.
Client:
The Main Contractor was Mowlem, the client was The Environment Agency. |
|
|
|
|
|
|
|