Mayesbrook Park – Flood Defence Gates.
Date: 01/10/2003
Company: TEMA Engineering
|
| |
|
|
|
TEMA Engineering completed the supply and installation of the Flood Gates in October 2003.
The project will protect the local park and housing from flood by control of river flow via 3 automatic synchronized guillotine gates.
The structure was designed by KGA Ltd. of Bournemouth.
TEMA Engineering carried out the complete supply, manufacture, painting and installation.
All instrumentation, electrics, hydraulics and control software was included in TEMA Engineering Ltd Main Contract Scope
Client:
The Main Contractor was Breheny, and the client was The Environment Agency. |
|
|
|
|
|
|
|