Burry Port Marina – Tidal Gate.
Date: 01/12/2002
Company: TEMA Engineering
     






TEMA Engineering completed the supply and installation of the Tidal Impoundment Gate in December 2002.

The project will allow the present tidal harbour to act as a Marina by impounding the sea at low tide via an Automatic flap gate.

The structure was Designed by KGA Ltd. of Bournemouth.

TEMA Engineering carried out the complete design, supply, manufacture, painting and installation.

All instrumentation, electrics, hydraulics and control software was included in TEMA Engineering Ltd Main Contract Scope.


Client:
Dean and Dyball Construction Ltd