A38 South Brent – Viaduct Strengthening
Date: 01/04/2001
Company: TEMA Engineering
     


TEMA Engineeringcompleted the Strengthening and painting of the A38 South Brent viaduct in April 2001.

The project was a 32 week major strengthening and repainting scheme.

The bridge was a box girder construction, which necessitated all internal works to be carried out under confined space legislation.

TEMA Engineering carried out the complete supply, manufacture, painting and installation.


Client:
The Main Contractor was Dean and Dyball, the client was The Highways Agency.