A38 Mardle – Viaduct Strengthening
Date: 01/04/2004
Company: TEMA Engineering
|
| |
|
|
|
TEMA Engineering completed the Strengthening and painting of the A38 Mardle viaduct in April 2004.
The project was a 32 week major strengthening and repainting scheme.
The bridge was a box girder construction, which necessitated all internal works to be carried out under confined space legislation.
TEMA Engineeringcarried out the complete supply, manufacture, painting and installation.
Client:
The Main Contractor was Mowlem, the client was The Highways Agency. |
|
|
|
|
|
|
|