Total Engineering Solitions About UsMarineHighwaysRailwaysEngineeringCorrosion ProtectionPartners and LinksContact Us
 
 
 
 
Welsh Assembly – Boardwalk
Date: 01/07/2004
Company: TEMA Engineering
     






TEMA Engineering complete the supply and installation of the Boardwalk outside the New Welsh Assembly Building in Cardiff Bay.

The new structure bridges the existing gap of old boardwalk to allow the public to walk waterside of the old dock walls for its complete length.

The structure was suspended from the old dock walls onto new piles driven into the dock basin.


Client:
Dean and Dyball who acted as Main Contractor carried out the piling.